Roofer showing a building owner a rusted skylight curb lap on a metal roof

About Our Muncie Metal Roof Coating Work

Restoring Commercial Roofs Through Prep You Can Check Yourself

Here is more about our Muncie metal roof coating work: how we inspect, prep, and coat commercial roofs, and how each step is recorded for you.

  • Every JobStarts with a roof walk
  • Every CoatThickness measured
  • Every OwnerGets a written scope
Roofer brushing rust primer along a metal panel seam before coating

More About Our Muncie Metal Roof Coating Work

The short version about our Muncie metal roof coating work: inspection decides the job, prep takes most of the time, and the coating goes on at a measured thickness.

We coat commercial buildings only: plants, warehouses, shops, offices, clinics, churches, and farm buildings used for business. Every roof gets a written scope before work is scheduled, so you know which screws, laps, and curbs get attention.

  • Roof walk, moisture readings, and photos on every job
  • Prep written out screw line by screw line
  • Wet film readings logged as coats go on
Roof Ticket

Want to See the Roof Before You Decide?

We walk the roof with you and point out what we would fix and why. Call to set a time that works for you.

Call Us

Phone: (463) 466-9855

What the Inspection Covers

Every roof walk follows the same list. You get photos of anything we flag.

  • Panels and Paint

    Chalking, rust spots, rust-through, and any panel that flexes or lifts underfoot.

  • Screw Lines

    Backed-out screws, split washers, stripped holes, and rust rings around heads.

  • Laps and Seams

    Side and end laps, ridge caps, and any seam where old sealant has shrunk.

  • Curbs and Penetrations

    Rooftop unit curbs, skylights, vents, exhaust fans, and pipe boots.

  • Gutters and Edges

    Gutter seams, outlets, eave trim, and signs of ice backing up in winter.

  • Insulation Moisture

    Meter readings across the roof, with test cuts where readings run high.

  • Inside the Building

    Stains, drips, and condensation under the roof, matched to what we found above.

What We Will Not Do

A few things stay off the table on every job. Here is each one and what we do instead.

We Will NotWhat We Do Instead
Coat over wet insulationReplace the wet sections first so water stays out of the roof
Coat over rust-through holesPatch or replace the steel, then prime and coat
Skip the screw linesTighten, upsize, or replace screws and seal every head
Mix coating families on a recoatKeep the recoat in the same family as the system
Coat failing shinglesRecommend repair or replacement for curled or soft roofs
Guess at thicknessTake wet film readings and record them
Promise a lifespanExplain what affects coating life on your roof

Questions About Our Muncie Metal Roof Coating Work?

Ask us anything about the process, or answer seven questions for a ballpark range on your roof.

Call (463) 466-9855